Pixmac000075583975

Our company was established in 2012, however, we have been providing installation of prefabricated structures, steel structures and building cladding installation using different systems since 2003.

We have been cooperating with several partners and leading producers of reinforced concrete and steel elements, and cladding on projects in the Slovak Republic, Czech Republic and also in other countries.

 

SWANK Ltd

 

PRIMUM Shopping Mall, Partizánske, Slovakia (Váhostav - Prefa s.r.o.)

Installation of prefabricated reinforced concrete frame (28 May 2012 – 13 June 2012).

Johnson Controls, Česká Lípa, Czech Republic (Prefa Praha a.s.)

Installation of prefabricated reinforced concrete frame (29 July 2012 – 13 August 2012).

Škoda, Mladá Boleslav, Czech Republic (Montáže Chrudim s.r.o.)

Installation of steel structure – construction of Duon East and West (16 July 2012 – 13 August 2012).

Bytterm, Žilina, Slovakia (Real s.r.o.)

Modification of existing steel trusses, replacement, welding and reinforcement of the steel structure (15 August 2012 – 30 August 2012).

Kinekus, Ružomberok, Slovakia (Real s.r.o.)

Installation of steel structure, completion of the Kinekus compound (10 October 2012 – 5 November 2012).

Siko koupelny, Praha-Stodulky, Czech Republic (Prefa Praha a.s.)

Installation of prefabricated reinforced concrete frame (16 August 2012 – 10 September 2012).

Neografia, Martin, Slovakia (Promont s.r.o.)

Installation of steel structure (15 September 2012 – 7 October 2012).

Penny Market, Vrbno pod Pradědem, Czech Republic (Goldbeck Prefabeton s.r.o.)

Installation of prefabricated reinforced concrete frame – columns with foot (1 October 2012 – 12 October 2012).

MASAM,  Vráble, Slovakia (Promont s.r.o.)

Installation of steel structure (10 October 2012 – 31 November 2012).

Fialka Leisuretime Centre, Říčany u Prahy, Czech Republic (Prefa Praha a.s.)

Installation of prefabricated reinforced concrete frame (15 October 2012 –  15 February 2013).

NGK Ceramics, Gliwice, Poland (Promont s.r.o.)

Installation of steel structure (1 November 2012 –  1 April 2013).

 Galéria Shopping Mall, Teplice, Czech Republic (Prefa Praha a.s.)

Installation of prefabricated reinforced concrete frame (15 November 2012 – expected date of completion: 30 Juni 2013).

Rebuilding urban spa on a new project Gallery, Liberec, Czech Republic (Prefa Praha a.s.)

The assembly of visual prefabricated panels + stairs and ramp - completely 89ks elements. (08.04.2013 - 10 may 2013).

Geressheimer Essen, Essen, Germany (Promont s.r.o./PSG a.s.)

Removal of glassmaking furnace steel - mounting individual elements of the new steel furnaces (08.05.2013 - 31 may 2013).

SWEDSPAN Slovakia, Malacky, Slovakia

The assembly of technological equipment - DIEFFENBACHER, installation of steel structures (24/08/2013 - 2013).

The thermal Power Plant, PRUNEŘOV, Czech Republic (PSG a.s.)

Modification and repair of existing steel structures, installation of new pieces of steel construction, repair welds on the old steel frame (01/07/2013 - 2013)

Volkswagen Bratislava, Slovakia (Promont s.r.o.)

Assembly of steel structure, accessories and equipment (20.08.2013 - 30.09.2013)

Riding arena for horses, Bilíchov, Czech Republic

Installation of prefabricated reinforced concrete frame (14 October 2013 –  30 October 2013).

SWEDSPAN Slovakia, Malacky, Slovakia (Promont s.r.o.)

Assembly of steel structure, accessories and equipment (15.08.2013 - 21.12.2013)

Production hall LIPRACO, Mníchovo Hradište, Czech Republic

Installation of prefabricated reinforced concrete frame (11 November 2013 –  2013).

 Pollmeier Furnierwerk, Creuzburg, DE 

The assembly of technological equipment installation of steel structures (01/12/2013 - 2014).

Vítkovice Reality Developments, Ostrava, CZ (Krossbau CZ) 

Installation of steel fences and accessories of approx 1700 meters (2014)
 

Obnova bytového domu, Klírová ulica, Praha, CZ (Revolt s.r.o.) 

Facade and insulation work, dismantling balcony constructions, waterproofing, tile work (2014)
 
  • Restoring hotel Steel Trinec, Trinec, Czech Republic (Revolt Ltd.)

Facade and insulation work, dismantling balcony constructions, waterproofing, tile work (2014)

  • Power plant Detmarovice, Detmarovice Czech Republic

Installation of steam piping and components in the power Detmarovice - welding, fitting and piping works (2014)

  • Nuclear Power Plant, Mochovce, Slovak Republic

Welding, fitting and piping works

  •  Production hall SEA Chomutov, Chomutov, Czech Republic

Installation of prefabricated reinforced concrete frame (2014).

  • Hall Powerprint A, B, C, Horoměřice, Czech Republic

installation of precast reinforced concrete frame (2014)

CURRENT PROJECTS

  • Rolling mill steel profiles Kosice, SK

Installation of extensions - steel frame and roof cladding, including plumbing components

  • Uniplast Pardubice, construction of a new production hall, Czech Republic

Installation of interior wall panels mineral (2,043 square meters), including plumbing components